Neuchâtel carried out the complete roof working out of small dismantle able pots Neuchâtel and their qualified team completed most of the roof then allowed the other trades to finish. Then last thing Neuchâtel QA the roof carried out remedial and repainted the whole roof again, so it looked like new. Due to the monolithic nature of mastic asphalt.
A complete QA package was handed over to the client at the end of the project showing sign off sheets and pictures of complicated details during construction.