SOLUTION
This large podium contract was carried out in stages. Firstly, the mastic asphalt up-stands were applied to allow all the windows to be installed. Asphaltech then returned at the end of the contract to apply the horizontal areas and planters. The whole area was then covered in an exposed aggregate concrete wear slab. The result was an effective, timely and quality finish to this large podium area was incredibly attractive. The warranty to this building of 15 years runs out and we have not been back once to this project.
GE Money Building Auckland
This project was one of Asphaltech very first projects. Asphaltech was established in late 2006 and was working on this project throughout 2006-2007 Neuchatel had been sold by Downer EDI to Nuralite and Asphaltech was the only installer in New Zealand who could install Neuchatel mastic asphalt.